Benefits | ||||||||||||||
|
Properties | |
Curing | |
Work life at 23°C | 90 minutes |
Time to handling at 23°C | 24 hours |
Time to full cure at 23°C |
about 7 days |
Time to full cure at 85°C |
2 hours |
Typical Performance (measurements @ 23°C) | |
Lap shear (Al/Al) | 20 MPa |
Peel strength (XPLE/XPLE) | 370 N/25mm |
Peel strength after thermal shock (4hrs@215°C) | 370 N/25mm |
Dynamic shear (boot/cable shell size 22) | 520N |
Solvent resistance (de-icing fluid, petrol, oil, hydraulic fluid) | Excellent |
Operating temperature |
-75°C to +150°C |
Colour | Black |